Located along the Airport Boulevard, two kilometers away from the Changi Airport’s three main terminals, the new Terminal 4 will be a two-storey, 25m high building with a gross floor area of 195,000m2 and about seven times the size of the former Budget Terminal.

Our work involved the excavation for the construction of the Main Terminal Building and supporting land side infrastructures such as the Taxi Holding Area, Multi-Storey Car Park, Mechanical & Electrical Block and Underpass. Our involvement at air side includes substructure excavation for the construction of Gangway and a dedicated 68m high Ramp Control Tower.

Project details

Project Title: Proposed Erection of a 3-Storey Airport Terminal Building (Terminal 4) with 2 Mezzanine Floors, a Basement and a Departure Holding Area, a 5-Storey Multi-Storey Carpark, a 2- Storey Taxi Holding Area, 2 Overhead Vehicular Bridge and a Pedestrian Overhead Bridge
Project Title: Proposed Erection of a 3-Storey Airport Terminal Building (Terminal 4) with 2 Mezzanine Floors, a Basement and a Departure Holding Area, a 5-Storey Multi-Storey Carpark, a 2- Storey Taxi Holding Area, 2 Overhead Vehicular Bridge and a Pedestrian Overhead Bridge
Client: Changi Airport Group (Singapore) Pte Ltd
Excavation Quantity: 210,000m3